The Ongoing Construction Saga… & stuff.

Whoo! Drywall on one room is done! Some mistakes here and there from learning the ropes – seams lined up when they should have been staggered, and some gaps that I couldn’t quite figure out how to fix, due to trying to mesh with drywall that had been done by contractors when the outer walls re-done due to the window swap. The gaps were in the corners, where the spaces were too small to put a screw through the drywall without breaking it. But hopefully, they can just be spackled in, or something. Nothing too horrible. Took about 15 hours total, just learning the ropes and figuring out what the hell we were doing. Probably 25-30 hours with the destruction of the old walls and such. Ended up taking about a calendar month to do, but largely because we weren’t working “full-time”. Satisfying, for certain, and it’s good to know that it’s as easy as it is. Spackling/taping is going to be left to the pros on this room, due to time constraints (roomie moving in in early May, nominally May 1), but future rooms will be up to us. Next up? Probably the downstairs.

Should be fun.

What have I been up to, you ask? Phantasy Star Online, mostly. My character’s name is ‘sinj’ and I’ve been playing on Epdote-7-1. If that doesn’t make sense, don’t worry about it. It’s a weird little game – really simplistic, when it comes down to it, and a horrible single-player game. But remarkably entertaining as a multiplayer game, and I’ve racked up 23 hours on it already, which is pretty insane given that I got the game last Wednesday, and have spent a couple days in between working on the house, and other things. Other games in the queue are Shenmue 2, Xenosaga, Zelda: TWW and Grandia 2, primarily, not in that order. But since the Xbox Live games are such social experiences, they basically take priority over anything else. Meeting a couple of the guys from TGF (see ad to your right) at E3 this year, so that should be a blast.

Leave a Reply